Artículo PDF (10,39 Mb)
Compatible solo con Adobe Acrobat Reader (leer más)

Sustainable reindustrialization of an existing plant for the prefabrication of the lining segments of the Florence high speed railway by-pass tunnels

2024 - Pàtron Editore

P. 31-42

24697 characters

Forma parte de

Gallerie e grandi opere sotterranee : XLVI, 152, 4, 2024