Article PDF (5.7 Mb)
Compatible only with Adobe Acrobat Reader (read more)

Stiffening the temporary lining to mitigate induced displacements in a pre-existing tunnel : a study of the Casacastalda tunnel doubling

2024 - Pàtron Editore

P. 24-40

53194 characters

Is part of

Gallerie e grandi opere sotterranee : XLVI, 151, 3, 2024